Good day to all:
Today I discovered several errors in the story that I would like to bring to the attention of my readers.
Problem 1:
This problem is totally my mistake, and I would like to acknowledge the reader who pointed out the mistake to me. I feel it is a bad practice to repeat the names people use on the site without their permission, but thank you very much JD40 - an abbreviated form of their name.
I have limited experience with load centers and other electrical work. When I wrote the scene of rewiring the BoA building in Chapter 8, I somehow overlooked that load centers receive 2-phase power. Shame on me for that. I also complicated the problem by overlooking that the larger generators that are typically towed by a vehicle generally output 3-phase power; although some have selector switches that permit output of a single phase.
I will be fixing that mistake in the near future and reposting the chapter. My initial thought was to do a quick and dirty fix, but decided it would be best if I fix the problem properly, which will be more work. It may take a few days to post a rewrite of those scenes, since I like to I let what I write sit for at least a day and then come back to it to proofread the fix.
Problem 2:
In the story, I use call signs. The call sign format is a word, such as Ark, that is followed by a series of single-digit numbers that are separated by underscore characters.
Today I noticed that in many places the underscore character is missing.
I checked the HTML formatted story files I submitted and the missing underscore characters were in the story files. SOL converts my HTML to the site format, and apparently there was a problem with the conversion algorithm. I notified our Web Master Lazeez of what I discovered, and we will correct the problem to include all posted files.
REP